hopkinton-independent-logo2x
Hopkinton, MA
loader-image
Hopkinton, US
9:26 am, Wednesday, July 22, 2026
73°F
92 %
Wind Gust: 8 mph
Clouds: 100%
Sunrise: 5:29 am
Sunset: 8:15 pm

SIGN UP TODAY!
BREAKING NEWS & DAILY NEWSLETTER





With Town Meeting warrant open, town offers guidance for submitting articles

by | Dec 31, 2021 | News

At its Dec. 14 meeting, the Select Board voted to open the May 2 Annual Town Meeting warrant.

Town Manager Norman Khumalo called it “a step that actually begins to bring residents into the legislative process,” and requested that any residents interested in adding an article reach out to Town Hall for assistance.

In a press release on Dec. 30, the town offered more information, indicating that article language can be submitted via email as a shared Google doc or in Microsoft Word format to Assistant Town Manager Elaine Lazarus at elainel@hopkintonma.gov, or on paper by mail to Town Manager’s Office, 18 Main Street, Hopkinton, MA 01748.

The town website (hopkintonma.gov) has a Guide for Citizen Petitioners with more details on the process.

The warrant will close Feb. 1.

0 Comments

Related Articles

Water main on Hayden Rowe Street to shut down Wednesday morning

A portion of the water main on Hayden Rowe Street will be shut down Wednesday morning, according to the Water-Sewer Department. In a notice to residents, Water-Sewer Manager Jed Fenneuff stated that a water main on Hayden Rowe Street will be shut down from 9 a.m.-1...

Fire hydrant on Pleasant Street

Ramp closures at I-90/I-495 interchange planned for Wednesday

The Massachusetts Department of Transportation will close two ramps at the Interstate 90/Interstate 495 interchange in Hopkinton Wednesday night to facilitate construction operations. Both the I-90 eastbound ramp to I-495 northbound (Exit 106) and the I-495...

MassDOT logo

Main Street Corridor Project update: Subdrain work continues

A.F. Amorello & Sons will be back next week to continue installing a subdrain, according to the latest Main Street Corridor Project update. The subdrain is being installed on the north side of Main Street between the driveway of 7 Main Street (east of the...

Road work sign
Key Storage 4.14.22