hopkinton-independent-logo2x
Hopkinton, MA
loader-image
Hopkinton, US
5:26 am, Saturday, January 31, 2026
-3°F
82 %
Wind Gust: 16 mph
Clouds: 5%
Sunrise: 7:00 am
Sunset: 4:58 pm

SIGN UP TODAY!
BREAKING NEWS & DAILY NEWSLETTER





Crack sealing work to begin on town streets Thursday

by | Jun 30, 2021 | News

The town’s highway manager announced this week that crack sealing work is scheduled to begin Thursday on a number of streets.

The work, which is expected to take two weeks to complete, will be performed between 9 a.m.-3 p.m., except for Frankland Road, which will be 7 a.m.-3 p.m. One lane of traffic will be open at all times.

The affected roads are: East Main Street (full length), Elm Street (Wood Street to Lumber Street Extension), Frankland Road (Legacy Farms Road North to Cross Street), Grove Street (full length), Hayden Rowe Street (Grove Street to Teresa Road), West Main Street (Main Street to Lumber Street and School Street to the Upton town line) and Wood Street (Whisper Way to Exchange Street).

Residents and visitors are asked not to park vehicles in the aforementioned streets during the time the work is scheduled.

0 Comments

Related Articles

HFD chief: JB Sawmill ‘a total loss’ in Thursday morning fire

JB Sawmill and Land Clearing burned down Thursday morning in a Fruit Street fire, rendering the facility "a total loss," according to Hopkinton's fire chief. In an interview Thursday evening with the Independent, HFD Chief Gary Daugherty described the blaze and...

JB Sawmill fire

Arrests/Police Log, Jan. 28 edition

ARRESTS Jan. 20 2:11 p.m. On Wood Street, Officers Benjamin Vaz and Augusto Diaz arrested a 21-year-old resident of Mount Pleasant Street in New Bedford on a warrant. A female took over operation of the vehicle. [Editor’s note: The Hopkinton Independent’s policy...

Hopkinton police cruiser

Conservation Commission continues Loop Road, North Mill Street hearings

https://www.youtube.com/watch?v=bRfFtOBQ0B4 At its four-hour meeting Tuesday, the Conservation Commission voted 4-0 to continue the hearing on the town’s request for determination of applicability for improvement to Loop Road that would provide better access to the...

Chamberlain St.-Loop Road trail
Key Storage 4.14.22